Walter E. Olson Memorial Library Renovation and Expansion Project
 

Week Ending: 07/28/2017

7/28/2017

0 Comments

 
Work In Progress This Week and Completed to Date:
  • Mechanical rough-ins continue
  • Frame interior walls and soffits
  • Basement was painted
  • Site walk thru to review electrical and data communication
  • Bryan is working on log design and samples
Two Week Look Ahead:
  • Plumbing, HVAC, and electrical rough-ins continue
  • Wood backing and blocking
  • Fireplace and venting install
  • Insulation
  • Gypsum board installation and sound insulation
  • Tape and finish gypsum board
  • Parking lot, cut to grade and stone
  • Masonry
  • Phone and data wire rough-in
  • Aluminum Entrances
  • Siding, soffits and fascia
  • Owner progress meeting August 3
0 Comments

Week Ending: 07/21/2017

7/26/2017

0 Comments

 
Work In Progress This Week and Completed to Date:
  • Mechanical rough-ins continue
  • Frame interior walls and soffits
  • Frame feature wall
  • Masonry veneer installation continues
  • Bryan is working on log design and samples
  • Owner progress meeting July 20
Two Week Look Ahead:
  • Plumbing, HVAC, and electrical rough-ins continue
  • Wood backing and blocking
  • Fireplace and venting install
  • Insulation
  • Gypsum board installation and sound insulation
  • Tape and finish gypsum board
  • Parking lot, cut to grade and stone
  • Masonry
  • Phone and data wire rough-in
  • Aluminum Entrances
  • Siding, soffits and fascia
  • Owner progress meeting August 3
0 Comments

​Week Ending: 07/14/2017

7/18/2017

0 Comments

 
Work In Progress This Week and Completed to Date:
  • Mechanical rough-ins continue
  • Frame interior walls and soffits
  • Masonry veneer installation
  • Electrical walk thru at addition on 7/13/17

​Two Week Look Ahead:
  • Plumbing, HVAC, and electrical rough-ins continue
  • Wood backing and blocking
  • Fireplace and venting install
  • Insulation
  • Gypsum board installation and sound insulation
  • Tape and finish gypsum board
  • Parking lot, cut to grade and stone
  • Masonry
  • Phone and data wire rough-in
  • Aluminum Entrances
  • Siding, soffits and fascia
  • Owner progress meeting July 20
0 Comments

​Week Ending: 07/07/2017

7/14/2017

0 Comments

 
Work In Progress This Week and Completed to Date:
  •  Mechanical rough-ins continue
  •  Framing at addition
  •  Install sill flashings, wall foam, and air barrier
  •  Exterior window install at addition
  •  Concrete floor at addition
  •  Roof shingles

​Two Week Look Ahead:
  • Plumbing, HVAC, and electrical rough-ins continue
  •  Frame interior walls, soffit
  •  Wood backing and blocking
  •  Fireplace and venting install
  •  Insulation
  •  Parking lot, cut to grade and stone
  •  Masonry veneer
  •  Electrical walk thru at addition (Thursday 7/13/17, 10:30)
  •  Phone and data wire rough-in
  •  Owner progress meeting July 20
Picture
0 Comments
    The Walter E. Olson Memorial Library remains open at 150 E. Hospital Road throughout the Expansion and Renovation Project at 203 N. Main Street. Visit this blog for updates on  construction status.

    Questions can be directed to nan@olsonlibrary.org

    Archives

    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.