Walter E. Olson Memorial Library Renovation and Expansion Project
 

Week Ending:  06/02/2017

6/6/2017

0 Comments

 
Work In Progress This Week and Completed to Date:
  • Frame interior walls, soffit
  • Install sill flashings, wall foam, and air barrier
  • Partial window install
  • Remove existing gas meter and line
    ​
Two Week Look Ahead:
  • HVAC roof and wall penetrations
  • Electrical rough-in walk through on June 8
  • Plumbing, HVAC, and electrical rough-ins
  • Framing at addition (Steel columns, wood beams, and trusses)
  • Pour concrete floor
  • Exterior window install
  • Parking lot, cut to grade and stone
  • Set door frames
  • Wood backing and blocking
  • Fireplace and venting install
  • Insulation
  • Masonry veneer
  • Owner progress meeting June 8
Picture
0 Comments

Your comment will be posted after it is approved.


Leave a Reply.

    The Walter E. Olson Memorial Library remains open at 150 E. Hospital Road throughout the Expansion and Renovation Project at 203 N. Main Street. Visit this blog for updates on  construction status.

    Questions can be directed to nan@olsonlibrary.org

    Archives

    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.